Manual P5/EP5

PMV

Valve

Control

System

GB

Manufacturers declaration

in compliance with EC directive 89/392/EEC, annex II B and 89/336/EEC.

We hereby confirm that the appliances described in this sheet has been manufactured in

compliance with the applicable standards and is intended for installation in a

machine/application, and that commissioning is strictly prohibited until evidence has been

provided that the machine/application in question is also in compliance

with EC directive 89/392/EEC and 89/336/EEC.

This manufacturers declaration is applicable to the following PMV-Positioner series:

P5, EP5, F5.

D

Hersteller-Erklärung

im sinne der EG-richtlinie 89/392/EWG, Anhang II B und 89/336/EWG.

Hiermit erklären wir, daß die in diesem Blatt beschriebenen Geräte entsprechend den gültigenNormen gebaut und zum Einbau in eine Maschine oder Applikation bestimmt sind, sowie daß

deren Inbetriebnahme so lange untersagt ist, bis festgestellt wurde, daß diese

Maschine/Applikation ebenfalls der EG-Richtlinie 89/392/EWG und 89/336/EWG entspricht.

Diese Herstellererklärung hat für folgende PMV-Stellungsregler-Serien Gültigkeit:

P5, EP5, F5.

F

Déclaration de fapicant

au sens dela directive de la CE 89/392/CEE, annexe II B et CE/89/336/CEE.

Nous déclarons par la présente que les appareils décrits sur cette page sont construits enconformité avec les normes en vigueur et qu"ils sont destinés à être montés dans une machineou une application, nous déclarons également que leur mise en service est interdite tant qu"il n"a

pas été constaté que cette machine/application satisfait également

à la directive CE 89/392 CEE et CE/89/336/CEE.

Cette déclaration de fournisseur est valable pour les types d"appareils PMV suivants:

P5, EP5, F5.

Mr. Roland Wedepand

President, Palmstiernas Instrument AB

– 2 –

Page

5.

7.

9.

13. Connections Span and zero adjustmentCam adjustmentMaintenance

Diaphragm

Balance arm

O-rings

5-6 8 91112 15-191617 18 1.aStorage Instructions, Storage Seal 3. Air requirements14.

18. Feedback UnitSpare part list

Approvals 20 23 24-27

– 3 –

Always check for latest edition of manual.

The P5 Valve Control System is a valve positioning system from PMVwith a modular design concept.

The base unit of the system is the pneumatic positioner, used in eithersingle or double acting applications. P5 comes standard with built in

dampers, a 5 mm high gain spool valve assembly, gauge ports and anO-ring sealed housing. The housing utilizes a unique O-ring seal thatcan be adjusted to a sealed or drained position.

The modular design concept allows for easy addition of accessories

such as I/P converter and/or a feedback package, both which are

isolated from the basic pneumatic unit. These accessories can be factoryor field mounted.

Ease of calipation and maintenance are built into to the design with

easily accessible span and zero adjustment, and very simple parts

replacement.

Fail Freeze

I/P Module

Explosion proof I/P module

Standard or I/S

I/P-converter

module

Dome

indicator

Mounting

adapter

plate F5 feedback module

Gauges

Mounting packetSpindles F5 Explosion Proof

– 4 –

PMV Positioner and feedback module storage

and handling procedures

PMV Positioners and feedback modules are precision instruments which should be storedand handled accordingly to avoid problems or damage.

Electropneumatic positioners/feedback modules contain electronic components whichcan be damaged by exposure to excessive water. Appropriate precautions should be takento protect units while in storage.

Warehouse storage

Stored in original PMV shipping containers, units should be stored in an environmentallycontrolled area, i.e. clean, cool (15-26°C, 60-80°F) and dry, out of direct sunlight or weatherexposure.

Field storage

Note: Once the air supply to the positioner is connected and turned on, internal air bleedwill prevent the ingress of moisture and protect the unit from corrosion. It is recommendedthat the air supply be left on at all times.

•If units are installed immediately, turn, and leave on, the air supply.

•If positioners must be stored outdoors, tighten all covers which may have loosened inshipment, make sure all open enclosure entry points are sealed.

Feedback modules should have cover tightened and conduits entries sealed. Positioners/Feedback modules should be wrapped and sealed air and watertight with desiccant insidethe plastic, units should be securely covered with an opaque cover and not exposed todirect sunlight, rain or snow.

Pneumatic positioners

Units should have all ports sealed and be protected from direct exposure to weather.For long term storage (>1 month) or overseas shipment units should be protected withplastic and desiccant.

Potential damage mechanism

When units are stored in hot, humid climates, the daily heating/cooling cycle will causeair to expand/contract and be drawn in and out of the positioner/feedback housing.Dependent on the local temperature variations, humidity and dew points

and time in storage condensation could occur and accumulate inside on the I/P Convertercausing erratic operation or failure due to water and corrosion. The potential forcondensation damage is especially high in southern climates and aggravated if units areexposed to direct sunlight.

For further assistance, please contact you nearest PMV office.

– 5 –

Storage Seal

P5/EP5 is supplied with all enclosure entry

points sealed.The seal is only a storage seal, not

to be used as seal when P5/EP5 is in operation.

If Storage Seal is removed or damaged, make

sure all open enclosure entry points are proper

resealed before further shipping or storage.

Use circular stickers marked I , S and OUT ,

supplied on Storage Seal or vapour proof tape.

P5

Remove Storage Seal from connection block,

mount positioner on actuator/valve, make

connections according to section 5, (Page 9).

Calipate span and Zero according to section 7,

(Page 11).

Clean any oil/depis off the connecting block,

then reseal open enclosure entry ports, use

circular stickers marked I , S and OUT , supplied

on Storage Seal or vapour proof tape.P5-SEAL

EP5

Follow P5 instructions as above. Remove

Storage Seal for conduit entry I E , connect inputsignal cable and install proper cable gland to

secure the units sealing.

IP5-SEAL

– 6 –

The P5 operates on a force balance principal. Force is originated by thesignal pressure transmitted through a diaphragm on to the balancearm. The opposing force is achieved through the feedback spring andis proportional to the position of the lower arm. The lower arm posi-tion is determined by the position of the cam which is secured to thespindle and connected to the actuator shaft thus providing the feed-back from the actuator/valve. When these two forces are equal, thebalance arm and the spool in the pilot valve are in a neutral position-the complete unit is in a balanced position. Air is supplied to the pilotvalve through port S, and controls the air flow through ports C1 andC2

Assume an equilipium position.

An increased control pressure will deflect the diaphragm 1 down,compressing the feedback spring 3. The balance arm 2 moves the spool7 in the pilot valve 8 furnishing supply air to the actuator, while at thesame time air is exhausted from actuator and is vented to atmospherethrough the pilot valve and the OUT port .

With the increased supply air, the actuator rotates (or moves linearly)moving the positioner spindle 6. The spindle and cam 5 rotate, forcingthe lower arm 4 upwards compressing the feedback spring 3. Thismotion will continue until the two forces are equal and the unit is in anequilipium position.

1 2

7

8

3

5 64

– 7 –

Maximum supply pressure is 1 MPa (150 psi).

Supply air shall be clean, dry and free from oil, water, moisture, foreign parts anddepis.

The air shall be freeze-dried or similar to a dew point of at least 10°C (18°F) belowlowest expected ambient temperature.

A

Before making pneumatic connections to the positioner, it is recommended thatthe supply air lines are opened up and allowed to vent for 2-3 minutes to clear anydepis from the line. It is further recommended that a large paper bag is used tocollect any oil or humidity that may be present in the line during this purging,direct the air flow into the bag. Should exessive amounts of oil and/or humiditybe present at this stage, a review of the pneumatic system should be carried outand the problem corrected.

Poor air quality is one of the major causes of premature failure

of pneumatic equipment.

P5 mounts on to the actuator using either the ISO F05 holes 4 and a PMV ISOmounting kit or by using the optional mounting adaptor and screws 5 tomount P5 on to existing PMV mounting kits.

Proper alignment of the positioner spindle to the actuator shaft is veryimportant since improper alignment can cause excessive wear and friction tothe positioner.

The spindle/positioner shaft assembly allows for quick and simple spindlechanges. To ensure the proper connection, the spindle 3 has a spring clip 2that must be properly installed. A solid ”click" should be felt when assemblingthe two pieces insuring that the two flats 1 are engaged into the positionershaft groove.

The spindle can be removed, by inserting two screwdrivers under the twotapered surfaces of the spindle and bending carefully. When the spring clipreleases the spindle will eject.

2

1

3

5 4– 8 –

Air connections are tapped for 1/4" G or NPT male connectors and areclearly marked. Gauge ports are for 1/8" G or NPT.

We recommend use of tape, Loctite 577 or similar user preferred forsealing.

Electrical connection on I/P unit accepts 1/2" NPT or PG 13,5 (M20)cable gland.

Port IInput instrument pneumatic signal 20-100kPa (3-15 psi)Port SSupply air, maximum 1 MPa (150 psi) Minimum 0,15

MPa (21 psi) for EP5

Port C1, C2Actuator connections (0,2-1 MPa). C2 opening port.OUT Exhaust air port. Do not block! Exhaust filter optional.Port IpGauge port for pneumatic input signal.

Port IE Input electric signal (4-20 mA) (On the I/P unit.)Port PGauge port for I/P unit output pressure ( On the I/P unit)Ports Ip, P, S, C1 and C2 are sealed with

plugs. To install gauges, unscrew plugs

and replace with gauges.

We recommend use of tape, Loctite 577

or similar user preferred for sealing.

Port OUT is for venting the unit. All air

from the positioner, actuator and

I/P unit is vented to atmosphere through

this port. Do not block this port. A high

flow silencer or an exhaust pipe can be

connected to this port to prevent foreign

objects from entering and blocking the

units exhaust. Connector in exhaust port

must not have less than 9 mm (3/8“)

orfice.

When using gases other than air for

supply – Please contact PMV.

On EP5 (P5 with I/P unit installed) I/P

unit is supplied with air from port S.

Port I is automaticly sealed off and

protected. No connection shall be made

to this port. See pages 13 and 14 for more

information.

For single acting operation plug port C1

for increasing signal to open valve. Plug

C2 for decreasing (reverse) signal to open

valve. – 9 –

The front cover of P5 is secured to the pneumatic unit with four

captured screws and sealed with an O-ring 1. The O-ring can be

looped over notches 2 in the front cover to allow for drainage.

There are eight locations on the front cover where the O-ring can be

looped. This O-ring system is common to the Pneumatic unit , I/P unit

and Feedback unit in the PMV Valve Control System P5. This unique

sealing system allows for complete sealing or draining of the units by

changing the position of the O-ring.

The indicator cover 3 is O-ring sealed and secured by a bayonet

coupling. The indicator cover is also used to secure the identification

cover 4.

To remove the indicator cover turn it slightly counterclockwise until it

loosens. Identification cover and O-ring 5 are now removable.

When installing indicator cover and identification cover make sure that

the O-ring is properly engaged.

1

15432

– 10 –

P5/EP5 is when shipped from PMV pre-calipated for 90 ±0,5 deg rotation, (can also be30, 45 or 60 deg, see installed cam).

For most applications the valve closed positionis more critical than valve open position,most attention should be paid at valve closedposition. Always start calipation procedure byapplying 0 % input signal, then adjusting zero.P5/EP5 is calipated by turning thumb wheels 1& 4.

Arrows on arm 5 indicate turning direction ofthumb wheels.

“-“ = Decrease zero/span

Calipation procedure

Check cam seating, section 9 before startingcalipation procedure.

1. Apply 0 % input signal (0% = 20 kPa/3 psior 4 mA)

2. Wait for steady state.

3. Adjust zero by turning the silver (lower)thumb wheel 4 with finger or with screwdriver 7 from the outside.

4. Apply 100% input signal (100% = 100 kPa/15 psi or 20 mA)

5. Wait for steady state then memorize result.6. Apply 0% input signal.

7. Adjust span if necessary. This is done byfirst loosing screw 2, then turning theyellow (upper) thumb wheel 1 “+“ or “-“and finally tighten screw 2. Spring top mustnot be in contact with spring guide 3.8. Check zero and adjust if needed.

9. Repeat steps 2 to 8 until desired calipationis achieved.

5

4

6

7

3 2

1

– 11 –

To adjust the indicator, take off front cover and pull the indicatorupwards until it comes off the Allen screw.

Before installing the indicator make sure that the Allen screw istightened. Press the indicator on the screw and adjust it by rotatingclockwise to desired position.

With the cover and indicator removed, loosen the screw 1 and turn thecam locking nut 2 counterclockwise until the cam loosens. Adjust thecam 3 as desired making sure that the ball bearing 4 always is ridingon an active lobe on the cam. To secure the cam, make sure that screw1 is backed out from the locking nut 2 then finger tighten the lockingnut and tighten screw 1. Install and adjust the indicator and reinstallcover.

16"

)

2

1

correct

1-2

m

/m (1

4

incorrect

3

The standard built in dampers 5located on the connecting block prov-ide a simple means of adjusting theactuator travel speed.

For maximum actuator travel speeddampers shall be adjusted to mini-mum damping position. (Fig).

Double acting actuators – adjustonly OUTLET damper, set SUPPLYdamper in minimum damping posi-tion.

Single acting actuators – adjust bothdampers for desired operation.

5

– 12 –

WARNING! Units installed in hazardous areas must have proper approvals.The I/P unit is mounted directly on top of the positioner unit.

No external air supply is needed since the I/P unit is supplied with air from thepositioner unit.

Port I on the positioner unit will be plugged when the I/P unit and the

appropriate gauge block gasket installed.The I/P unit accepts a 4-20 mA inputsignal.

The I/P unit is equipped with a built in 30 micron filter (Fig 4).

Caution: Do not operate the unit without filter and filterplug installed.Do not unscrew filterplug when the positioner is pressurized.Span and Zero for the I/P converter is factory setand can not be adjusted

1

2

– 13 –

Switch off supply air and disconnect input signal – port I.

Loosen screws 3 and remove connection block 1, the gauge or plug fromport Ip, the fitting from port I and existing gasket 4. Carefully installgasket 6 supplied together with I/P unit. When correct installed port Iwill be blocked by the gasket.

Make sure that relief valve spring 5 is installed properly. Install theconnection block 1 to the positioner unit 2.Remove cover on I/P unit.

Install the I/P unit to the top of the Positioner unit, making sure that thefour O-rings are present and properly seated. Tighten the unit with thethree screws. (See fig. 1 and 2 page 13) Screw 1 first, screw 2 last.WARNING! Units installed in hazardous areas must have properapprovals.

Connect input signal cable to port I E and tighten the cable gland (see fig 5on page 13). Adjust the O-ring on the I/P Unit housing to desired posi-tion - sealed or drained. (See fig 3 on page 13 or section 6 on page 10).A gauge indicating output signal from the I/P converter can be installedin port P. Make sure that the filter plug is tightened before supply air isswitched on (Fig 4 on page 13).

6

2

4

1

5

3

– 14 –

Pilot valve

To remove the pilot valve for cleaning or inspection, remove the screw1 and carefully lift out the complete assembly 2. Gently remove thespool 3 from the block and clean the parts, using methylate cleaner orsimilar. Blow the parts dry with compressed air. Install the spool intothe pilot valve housing, place it on a flat surface, then lift it carefully inone end. Before reaching 20 deg angle the spool should move by itself.Should the parts show signs of wear, a new assembly is recommended.Mixing spool valves and valve bodies may result in very high bleedrates and poor performance. Check the O-rings, then secure and installthe pilot valve assembly into positioner unit, press it towards the

positioner housing wall and secure it with screw 1. Make sure that theleaf spring 4 on the balance arm 5 is properly fitted in the groove onthe spool 6. Check again to insure smooth operation of the assembly.To maintain original factory performance specifications, use only spoolvalve assemblies supplied by PMV

3

6

2

5

4

1

– 15 –

Diaphragm

If P5 is equipped with I/P unit (EP5), the I/P unit must be removed toaccess the diaphragm.

When installing the diaphragm make sure to place one washer on eachside of the diaphragm.

Put some Loctite 577 on the thread, install the screw 3 and tighten.

Make sure the diaphragm is centered.

– 16 –

Feedback spring

Once the front cover andindicator are removed,the feedback spring canbe easily accessed.

Hold the spring 1 fromthe top, pull down andout.

When installing, holdthe assembly at the top,guide the lower part toposition on the zeroscrew, then press downuntil it fits easily underthe balance arm 2. Makesure that the assembly isaligned properly againstthe lower arm and thenotch is engaged in thetab on the balance arm 2.

Balance arm

The balance arm canonly be removed afterI/P unit, diaphragm andfeedback spring havebeen removed. (Seesections above and onpage 13, 14 and 16).

Loosen the screws 3 andthe balance arm can beremoved.

When installing thebalance arm make surethat the leafspring 4 onthe underside of thebalance arm 5 is

properly engaged intothe groove 6 of the spoolin the pilot valve.

Tighten the two screws 3holding the balance armto the positioner.

2

1

3

6

5

4

– 17 –

Lower arm

Once the front cover is removed, the lower arm can be easily accessed.Remove the indicator, feedback spring and the cam.Loosen screw 2 and remove twist stop 1.

Remove screw 3, lower arm 4, rod 5 and spring 6.

Check rod and lower arm for wear, replace if necessary. Clean the rodand install it in the lower arm. The lower arm should move easily andsmoothly.

Install the lower arm and rod assembly into the positioner housing,making sure that the spring 6 is attached properly to the lower armand positioner housing.

Secure the lower arm and rod assembly with the screw 3. Check again that the lower arm moves smoothly.

Apply a small amount of grease on the small tongue on the lower arm,then install and secure the twist stop.

Install cam, feedback spring, indicator and front cover.

436

2 1 5

O-rings

With time and use, O-rings can become pittle. This can cause pooroperation and even failure of the positioner.

Always check O-rings when performing any work on the positionerand replace bad O-rings.

A thin layer of silicon grease applied on the NBR (Black) O-rings

prolongs their life. On Q (red) O-rings, use a non silicon based grease.

– 18 –

Filter plug

Caution! Do not operate the unit without filter and filter plug

installed. Do not attempt to unscrew filter plug while positioner ispressurized.

EP5 is equipped with a built in secondary filter located on theside of the I/P unit.

For replacement or inspection, make sure that positioner unit is notpressurized, then unscrew filter plug 1. Remove filter 3 and install anew into the filter plug . Check condition of O-ring 2 and filter

compartment. If moisture is found, check upstream filters/oil-waterseparators. Moisture can cause I/P failure.Reinstall filter plug.

3

2

1

– 19 –

See feedback module instructions for connections and calipation.

The P5 or EP5, Valve Control System, can easily be equipped with a Feedbackunit, model F5. This unit will mount directly on top of the Pneumatic positio-ner replacing the positioner front cover. The O-ring located on the bottom ofthe Feedback unit, F5, will provide the same sealing or draining capabilitiesas the front cover. The indicator and front cover from the positioner unit canthen be installed on to the Feedback unit.

WARNING! Units installed in hazardous locations must have properapprovals.

Installing the feedback unit.

—Remove the front cover, indicator, and Allen head screw from

the top of the positioner spindle.

—Install the drive coupling 4 and adjust the O-ring seal on the bottom in

either sealed or draining position. (See section 6, page 10).

—Install the Feedback unit 9 on top of the Positioner unit, making

sure the coupling is properly engaged before tightening the fourscrews 5.

—Make electrical connections and tighten cable glands.

(See F5 manual for details).

—Adjust cams and/or potentiometer to desired position.—Install the indicator and front cover.

95

4

O-ring seal

– 20 –

Signal change results in actuator running to end positions.—Check coupling between positioner and actuator.—Check cam position and locking screw.—Check input signal.

Inaccurate positioning.

—Dirty or worn pilot valve.

—Defective or leaking diaphragm.—Input signal fluctuates.—Incorrect sizing of actuator.—Valve/actuator "stiction".

—High valve/actuator peakaway torque.—

Loose cam.

Note: All PMV-positioners are serialized. Please notedown, and provide the serial number when contactingthe factory for trouble shooting or service.Signal change has no effect on the actuator position.—Check indicator and screw.

—Check air supply to positioner and tubing to the

actuator.

—Check input signal to positioner.

—Check diaphragm for damage or leakage.—Check pilot valve function.—Check cam for correct setting.—Check I/P output

Gain (pressure 600 kPa/87 Psi) 1 000 (kPa/kPa)

Air consumption at Supply pressure:0,4 MPa/58 Psi0,8 MPa/116 Psi

12,3 nl/min27,8 nl/min

0.43 SCFM0.98 SCFM

13,6 nl/min30,5 nl/min0.48 SCFM1.08 SCFM1/4" NPT or GConnector threadsIngress protection

* Per cent of full scale.

IP 66/NEMA 4

(The information in this manual is subject to change without notice.)

– 21 –

84

– 22 –

I/P UNIT Part list.Pos Part no Qty Description

incl. packet

– 23 –

Approvals E5-IS/EU

Approvals E5-EX/EU

Approvals E5-IS/US & E5-EX/US 1

Approvals E5-IS/US & E5-EX/US 2

W A R N I N G !

T h e s e i n s t r u m e n t s m u s t b e i n s t a l l e d i n a c c o r d a n c e w i t h l o c a l a n d n a t i o n a l c o d e s o f p r a c t i c e , e s p e c i a l l y f o r h a z a r d o u s a r e a i n s t a l l a t i o n s . T h e i n s t r u m e n t s a r e f u l l y i s o l a t e d f r o m g r o u n d a n d t h e r e f o r e g r o u n d i n g i s u n n e c e s s a r y f o r f u n c t i o n a l p u r p o s e s . H o w e v e r , g r o u n d i n g m a y b e n e c e s s a r y t o c o n f o r m t o i n s t a l l a t i o n c o d e s .

W A R N I N G !

I n s t a l l a t i o n o f a n y h a z a r d o u s a r e a e q u i p m e n t s h o u l d b e m a d e i n a c c o r d a n c e w i t h h a z a r d o u s a r e a i n s t a l l a t i o n c o d e s a n d a l s o o f c o u r s e t o t h e i n s t a l l a t i o n t o t h e i n s t a l l a t i o n a n d o p e r a t i n g i n s t r u c t i o n s p r o v i d e d . T h e m a n u f a c t u r e r c a n n o t b e h e l d r e s p o n s i b l e f o r i n c o r r e c t i n s t a l l a t i o n o r a n y c u s t o m e r m o d i f i c a t i o n s t o , o r r e p a i r o f , a c e r t i f i e d i n s t r u m e n t a s t h i s m a y i n v a l i d a t e t h e c e r t i f i e d d e s i g n . I f a c e r t i f i e d i n s t r u m e n t s h o u l t f a i l , n o a t t e m p t s h o u l d b e m a d e b y t h e u s e r t o e f f e c t r e p a i r . T h e u n i t s h o u l d b e r e t u r n e d t o t h e f a c t o r y .

Approvals EP5-IS (I/P-converter with white label)

– 28 –

FM

– 29 –

CSA

– 30 –

CENELEC

ATEX

– 31 –

Palmstiernas Instrument ABKorta Gatan 9SE-171 54 SolnaSWEDEN

Tel:+46 (0) 8 555 106 00Fax:+46 (0) 8 555 106 01E-mail: info@pmv.nuInternet:

SUBSIDIARIES:

PMV Controls LtdHeadlands Business ParkRingwood

Hampshire BH24 3PBENGLAND

Tel:+44 (0) 1425 48 08 88Fax:+44 (0) 1425 48 08 89

E-mail: sales@pmv-controls.ltd.ukInternet: .ukPMV-USA, Inc1440 Lake Front CircleUnit 160

The Woodlands, Texas 77380USA

Tel:+1 281 292 7500Fax:+1 281 292 7760

E-mail: pmvusa@pmvusa.com

Internet:

PMV GmbHSperweg 16D-41468 NeussGERMANY

Tel:+49 (0) 2131 795 74-80Fax:+49 (0) 2131 795 74-99E-mail: info@pmv-germany.deInternet: Svenska ABBox 21

SE-663 21 SkoghallSWEDEN

Tel:+46 (0) 54 52 14 70Fax:+46 (0) 54 52 14 42

E-mail: info@palmstiernas.seInternet:

23740/2002.14 Ekvator

(The information in this pochure is subject to change without notice.)

Distributor

– 32 –